Water & environment · Ballina Shire Council
Ballina flood mapping heads for public exhibition, with property resilience to be added to future study
Ballina Island and West Ballina residents will be invited to comment on draft stormwater plans and associated flood mapping after Ballina Shire Council’s unanimous resolution on 26 November.

Reporting from public council minutes. How this article was prepared
According to the supplied, unconfirmed minutes, residents in Ballina Island and West Ballina are expected to have their say on draft stormwater plans and flood mapping after Ballina Shire Council unanimously endorsed their public exhibition on 26 November.
The resolution covers the Draft Ballina Island and West Ballina Local Stormwater Management Study and Stormwater Masterplan, together with associated flood mapping. It does not approve construction works or commit council to a particular infrastructure project.
Council also resolved to encourage property-level flood resilience by including a property modification or resilience measure in the update of the Ballina flood risk management study and plan. The minutes do not identify the measures, their cost, who would fund them or when the updated study and plan will be completed.
No exhibition date is given in the minutes.
What deserves a closer look
The resolution endorses public exhibition, not construction works or funding for individual properties.
The resolution does not specify the future resilience measure's design, cost, funding or delivery timetable.
The confirmation and signing statements are dated after the supplied source-check date of 27 November 2026; this article therefore treats the minutes as unconfirmed.
Questions for follow-up reporting
When will the draft stormwater study, masterplan and flood mapping be exhibited, and for how long?
What property modification or resilience measures will be considered in the updated flood-risk study and plan?
Would any property-level measures be funded by council, property owners or another source?
What further approvals would be required before stormwater or flood-resilience works proceed?
What happens next
Council is to arrange public exhibition of the draft Ballina Island and West Ballina stormwater study, masterplan and associated flood mapping under the recorded resolution; no exhibition date is stated.
The recorded resolution calls for a property modification or resilience measure to be included in the update of the Ballina flood risk management study and plan; it does not establish that the update has been completed.
Check the record
These passages were matched to the source text. Read them in context in the original minutes.
Public exhibition of the Draft Ballina Island and West Ballina Local Stormwater Management Study and Stormwater Masterplan and associated flood mapping was endorsed, and the vote was recorded as unanimous.
Endorses the public exhibition of the Draft Ballina Island and West Ballina Local Stormwater Management Study and Stormwater Masterplan and associated flood mapping, as described in this report and included as Attachment 1 to this report. 2. Encourage property level flood resilience by including a property modification / resilience measure to the update of the Ballina flood risk management study and plan. FOR VOTE - All Councillors voted unanimously.
Item 10.1, resolution 261126/19, public exhibition provision and concluding vote
Open original minutes ↗The resolution calls for property-level flood resilience to be encouraged by including a property modification or resilience measure in the update of the Ballina flood risk management study and plan.
2. Encourage property level flood resilience by including a property modification / resilience measure to the update of the Ballina flood risk management study and plan. FOR VOTE - All Councillors voted unanimously.
Item 10.1, resolution 261126/19, point 2
Open original minutes ↗The closing text states that the minutes were submitted for confirmation on 10 December 2026 and signed by the Mayor at that meeting.
MAYOR 14. Confidential Session Nil Items MEETING CLOSURE 1.05 pm The Minutes of the Ordinary Meeting held on 26/11/26 were submitted for confirmation by council on 10 December 2026 and amendments (if any) are contained in the confirming resolution. Such Minutes were signed by the Mayor at the meeting on 10 December 2026.
Meeting closure and confirmation statement
Open original minutes ↗Source record
This article reports from the supplied, unconfirmed minutes of Ballina Shire Council’s ordinary meeting held on 26 November 2026.
Key facts from the minutes
- Council resolution 261126/19 endorsed public exhibition of the draft Ballina Island and West Ballina stormwater study, masterplan and associated flood mapping.
- Council supported including a property modification or resilience measure in the updated Ballina flood risk management study and plan.
- The resolution was recorded as unanimous.
- The minutes do not state an exhibition date, the proposed measures’ cost or who would fund property-level resilience work.
Why it matters
- People in Ballina Island and West Ballina may be affected by future stormwater, flood-management and property-resilience decisions, but this resolution does not approve works or funding for individual properties.