The committee advanced several local traffic-safety projects, approved temporary event road closures and litter-collection time trials, progressed Quarry Reserve design, and noted reviews of major infrastructure and synthetic sports fields.

14 September 2026Assets and Infrastructure CommitteeSummary available

Topics

  • Oatley traffic-calming package moves to design
    Council has endorsed a new speed hump, kerb blisters, signage and related safety works on Hurstville Road, plus line markings at Judd Street.
    The works could change traffic speeds, parking and pedestrian safety on a busy local route, but funding is still required.
  • Carlton residents' 3-tonne road concerns prompt enforcement action
    Speed humps and line markings are proposed for Edward Street while Council responds to concerns about heavy vehicles breaching the existing 3-tonne restriction.
    The decision combines new physical works with possible stronger enforcement affecting residents, freight operators and drivers.
  • Earlier rubbish collection trial could bring 3am vehicle activity to local roads
    Council approved a six-month trial moving public-place litter collection starts as early as 3am across parts of Beverly Hills, Hurstville and Kingsgrove.
    The service change may improve cleaning coverage but raises a direct amenity and early-morning noise issue for residents and businesses.

Decisions

  • Hurstville Road and Judd Street safety works
    The proposed speed hump, kerb blisters, signage and associated safety improvements on Hurstville Road west of Ada Street, Oatley, were endorsed for detailed design subject to Traffic Program capital funding. Proposed line markings at Hurstville Road and Judd Street were approved for installation.
    Residents may see new traffic-calming infrastructure and line-marking changes, subject to funding and design.
  • Edward Street traffic improvements
    Speed humps, signage and line markings at Edward Street, Carlton, were supported. The committee also noted resident concerns about the existing 3-tonne restriction and requested action to improve compliance and enforcement.
    The works aim to improve safety, while heavier vehicles may face increased enforcement of the existing restriction.
  • Public-place litter collection time trial
    A six-month trial was approved to move some litter-collection vehicle start times earlier, including starts from 3.00am or 4.00am at locations in Beverly Hills, Hurstville and Kingsgrove. Affected stakeholders are to be notified before the trial begins.
    Residents and businesses may experience earlier collection activity and associated vehicle noise.
  • No Domestic Violence Walk road closure
    A temporary Class 4 event road closure was approved between Kogarah Park and Kogarah Town Square on 20 November 2026 from 10.30am to 1.00pm. Council will liaise with NSW Police and notify affected stakeholders.
    Travel in and around Kogarah may be affected during the event.
  • Quarry Reserve precinct concept design
    The committee noted community engagement outcomes and endorsed the Quarry Reserve Precinct Concept Design as the basis for detailed design, including further investigation of two dedicated pickleball courts. Detailed design will examine noise, lighting, landscaping, parking, accessibility, asset lifecycle costs and environmental matters. Construction is expected to be deferred by approximately one year from the current capital-works timing.
    The project is progressing, but construction may be delayed and the pickleball courts are not yet finally approved or funded.
  • Park Road corridor investigation
    The outcomes of the Park Road corridor traffic study were noted. Further investigations will assess the design and geometric feasibility of a proposed roundabout at Park Road, Wyee Street and Bayview Street, with further consideration of dedicated pickleball courts, operational issues and possible right-turn restrictions at Ramsgate Road and Park Road. Future proposals are to be reported to the Local Transport Forum before implementation.
    Potential intersection changes, parking, accessibility, noise and traffic restrictions remain under investigation and are not yet final decisions.
  • Synthetic sports fields review
    The committee noted Council's internal review of synthetic sports fields and the NSW Chief Scientist and Engineer's independent review and guidance. Further assessment is to cover alternative surfaces, infill products, emerging technologies, stormwater treatment, lifecycle costs, environmental impacts and community outcomes.
    Future decisions about synthetic sporting surfaces may be informed by environmental, health, maintenance and cost assessments.

Discussion

  • Traffic and road safety program
    Multiple local traffic projects were approved or advanced, including works in Oatley and Carlton and investigations along the Park Road corridor.
    These projects may change local traffic conditions, pedestrian safety and vehicle restrictions.
  • Quarry Reserve project timing and scope
    The concept design was endorsed for detailed design, but specialist investigations and lifecycle-cost work are expected to defer construction by about one year.
    The reserve may receive upgraded facilities in the future, but delivery timing remains uncertain.
  • Earlier litter-collection operations
    A six-month trial will bring forward collection start times at a number of busy roads and centres.
    The change may improve early-morning service coverage but could affect noise and amenity.
  • Synthetic turf policy and environmental assessment
    Council is reviewing synthetic field materials and mitigation measures against current NSW Government guidance.
    The review may influence the design, maintenance and environmental management of future sports fields.

Impacts

  • Traffic-calming and line-marking works may proceed in Oatley and Carlton, subject to detailed design and funding.
  • Earlier litter-collection vehicle operations will be trialled for six months in parts of Beverly Hills, Hurstville and Kingsgrove.
  • Temporary road closures will affect the Kogarah Park to Kogarah Town Square route on 20 November 2026.
  • Quarry Reserve construction may be delayed by approximately one year while design, specialist studies and funding are developed.
  • Potential Park Road roundabout and right-turn restrictions remain subject to further investigation, consultation and future decisions.

Places

  • Hurstville Road, Oatley (road)
    Proposed speed hump, kerb blisters, signage and road-safety improvements west of Ada Street.
  • Judd Street and Hurstville Road, Oatley (intersection)
    Approved proposed line markings.
  • Edward Street, Carlton (road)
    Proposed speed humps, signage and line markings; existing 3-tonne restriction to receive compliance attention.
  • Park Road, Wyee Street and Bayview Street (intersection)
    Further investigation of a proposed roundabout.
  • Ramsgate Road and Park Road (intersection)
    Possible right-turn restrictions subject to consultation and funding.
  • Quarry Reserve (reserve)
    Concept design progressing to detailed design, including investigation of dedicated pickleball courts.
  • Kogarah Park and Kogarah Town Square (event route)
    Temporary road closure for the No Domestic Violence Walk.
  • Beverly Hills, Hurstville and Kingsgrove (service areas)
    Locations included in the public-place litter collection start-time trial.

Next

  • Prepare detailed design for the Oatley Hurstville Road safety works, subject to available capital funding.
    Future design stage
  • Install approved line markings at Hurstville Road and Judd Street, Oatley.
    Following approval and implementation scheduling
  • Undertake further geometric and operational investigations for the Park Road corridor, including the proposed roundabout and possible turn restrictions.
    Before any implementation; findings to return to the Local Transport Forum
  • Progress Quarry Reserve to detailed design and investigate pickleball courts, specialist studies, costs and construction staging.
    Detailed-design phase; construction expected to be deferred by about one year
  • Notify affected stakeholders and coordinate with NSW Police for the No Domestic Violence Walk road closure.
    Before 20 November 2026
  • Run the revised public-place litter collection start-time trial and notify affected stakeholders beforehand.
    Six-month trial; commencement date not stated
  • Continue assessment of synthetic-field materials, infill, drainage, lifecycle costs and environmental impacts.
    Future project and asset-planning decisions

Extract

MINUTES Assets and Infrastructure Committee Monday, 14 September 2026 Dragon Room Georges River Civic Centre Hurstville Georges River Council - Minutes of Assets and Infrastructure Committee Meeting - 14 September 2026 PRESENT COUNCIL MEMBERS The Mayor, Councillor Elise Borg, Councillor Natalie Mort (Chair), Councillor Matthew Allison, Councillor Tom Arthur, Councillor Thomas Gao, Councillor Gerard Hayes, Councillor Christina Jamieson, Councillor Kathryn Landsberry, Councillor Nancy Liu, Councillor Peter Mahoney, Councillor Leon Pun, Councillor Sam Stratikopoulos, and Councillor Ben Wang. COUNCIL STAFF Acting General Manager – Kristie Dodd, Director Assets and Infrastructure – Bryce Spelta,...