Tuggerah’s Glen rehabilitation centre approved with bushfire, traffic and environmental conditions The Central Coast Local Planning Panel approved alterations and additions at 50 Church Road, with a recorded unanimous 4 - 0 vote and conditions covering construction, fire safety, ecology and site management. Council: Central Coast Council Meeting: 19 November 2026 Recorded status: approved BRIEF The Central Coast Local Planning Panel approved DA/2011/2025 for alterations and additions at The Glen Rehabilitation Centre, 50 Church Road, Tuggerah. The recorded unanimous 4 - 0 approval is subject to conditions covering bushfire and fire safety, ecological protection, construction traffic, waste, landscaping and site management. The minutes record no public submissions but do not give a construction timetable. KEY FACTS - DA/2011/2025 for alterations and additions at The Glen Rehabilitation Centre, 50 Church Road, Tuggerah, was approved under section 4.16(1) of the Environmental Planning and Assessment Act 1979. - The approval is subject to Attachment 2 conditions and amendments recorded by the panel. - New or amended requirements cover ecological protection, waste, bushfire safety, fire safety, construction traffic, emergency contacts, landscaping and the site’s Plan of Management. - Conditions 2.17 and 2.9 were deleted because the minutes say they were included in error. - The recorded vote was unanimous, 4 - 0, and the minutes say no public submissions were made. ANALYSIS OF THE RECORD - The approval is conditional, with requirements applying before construction, during construction and before occupation in specified circumstances. - The minutes do not provide a construction start or completion date, so the timing of works cannot be established from this record. - The panel's conditions concern both the physical works and future changes to the site's approved management arrangements. QUESTIONS FOR FOLLOW-UP REPORTING - Has the applicant submitted the fire-safety report required before the relevant Construction Certificate? - When will construction begin, and will Council publish a timetable for the works? - What additional requirements in Attachment 2 apply beyond the amendments reproduced in the minutes? RECORDED NEXT STEPS - Before the relevant Construction Certificate is issued, submit the required fire-safety details to the Principal Certifier. - Prepare and implement the Construction Traffic and Pedestrian Management Plan, obtaining any required Road Occupancy Licence or Works Zone approval before the relevant arrangements are implemented. - Implement the ecological, waste, bushfire and landscaping requirements at their specified stages, including preparing the bushfire emergency management and evacuation plan before an occupation certificate is issued. - Notify the external referral of Council's decision. SOURCE PASSAGES The record is the minutes of the Central Coast Council Local Planning Panel meeting held on 19 November 2026. "OFFICIAL Central Coast Council MINUTES of the Local Planning Panel Meeting Held remotely online via Teams Thursday 19 November 2026 Panel Members Jason Perica Chairperson Louise Menday Panel Expert David Furlong Panel Expert Margaret Harvie Community Member Central Coast Council Staff Attendance Ailsa Prendergast Specialist Projects and Assessments Julie Terzoudis Senior Development Planner Sharnee Viney Civic Support Officer Kylie Blakely Civic Support Officer The meeting was an electronic meeting, as opposed to a public meeting." (Document title and meeting details) The panel approved DA/2011/2025 for alterations and additions to an existing group home and community facility on Lot 27 DP 755263 at The Glen Rehabilitation Centre, 50 Church Road, Tuggerah, under section 4.16(1) of the Environmental Planning and Assessment Act 1979, subject to the draft conditions in Attachment 2 and listed amendments. "2 REPORTS 2.1 DA/2011/2025 - The Glen Rehabilitation Centre, 50 Church Road, TUGGERAH NSW 2259 1:12pm 2.1 DA/2011/2025 - The Glen Rehabilitation Centre, 50 Church Road, TUGGERAH NSW 2259 Site Inspected Yes in person or by Virtual Site Inspection Relevant Considerations As per Council assessment report Materials Considered • Documentation with application • Council assessment report • Submissions • Council memo dated 19/11/2020 Council Recommendation Approve Central Coast Council Local Planning Panel Minutes 19 November 2026 Page 3 Panel Decision: 1. That Development Application No. DA/2011/2025 for Alterations & Additions to an Existing Group Home (Transitional) & Community Facility (CCLPP), (Integrated) on Lot 27 DP 755263, The Glen Rehabilitation Centre, 50 Church Road, TUGGERAH, NSW, be APPROVED pursuant to section 4.16(1) of the Environmental Planning & Assessment Act 1979, subject to the draft conditions in Attachment 2, with the following amendments;" (Item 2.1, Panel Decision) The conditions require native species occurring within the Central Coast local government area, construction erosion and sediment controls, a construction environmental management plan prepared before works and implemented during construction, and all construction plant, machinery and equipment to be thoroughly cleaned and, where appropriate, disinfected before entering the site. "Without limiting the requirements of the Ecological Assessment Report, the following measures must be implemented: 1. Landscape planting must utilise native species occurring within the Central Coast Local Government Area. 2. Best-practice erosion and sediment controls must be installed and maintained throughout construction to prevent the off-site movement of sediment and other materials, particularly into the buffer zone and adjoining remnant vegetation. 3. Prior to the commencement of works, a Construction Environmental Management Plan (CEMP) must be prepared and implemented for the duration of construction. The CEMP must include, as a minimum, measures for erosion and sediment control and waste management. 4. All construction plant, machinery and equipment must be thoroughly cleaned and, where appropriate, disinfected prior to entering the site to minimise the introduction and spread of weeds and pathogens, including exotic grasses, Phytophthora cinnamomic (Root-rot fungus) and Frog Chytrid fungus., 5.18, 6.23, 9.9 (with JP change for planner management)." (New condition 4.14, environmental measures) Works must follow the approved Demolition and Construction Waste Management Plan produced by Waste Audit and Management Group Pty Ltd, dated 3 September 2026. "5. 5.18- Carry out works in accordance with the approved Demolition & Construction Waste Management Plan produced by Waste Audit and Management Group Pty Ltd, 3 September 2026. 6." (New condition 5.18) Bushfire requirements include maintaining the Asset Protection Zone and surrounding internal areas, designing and constructing Buildings 19, 21 and 22 to BAL-12.5, upgrading ember protection at existing Building 12, and providing compliant property access and fire hydrants. "This includes: Central Coast Council Local Planning Panel Minutes 19 November 2026 Page 4 7. Maintain the Asset Protection Zone and internal areas surrounding the development by regular slashing/mowing in accordance with Figure 4 of the Bushfire Assessment Report; 8. Designing and construct Buildings 19, 21 and 22 to BAL-12.5 in accordance with AS 3959 and the applicable NSW variation identified in Planning for Bush Fire Protection 2019; ii. Upgrade ember protection to existing Building 12 to the standard of 'minimal protection measures' in accordance with the NSW Rural Fire Service guidance Upgrading of Existing Buildings and Appendix A of the Bushfire Assessment Report; ▪ Provide property access in accordance with the applicable Acceptable Solutions in Table 5.3b of Planning for Bush Fire Protection 2019; ▪ Provide fire hydrants in accordance with AS 2419.1-2021;" (New condition 6.23, bushfire protection measures) A bushfire emergency management and evacuation plan must be prepared before an Occupation Certificate is issued. Required bushfire protection measures must be implemented before occupation where applicable and maintained for the life of the development. "and ▪ Prior to the issue of an Occupation Certificate, preparing a Bushfire Emergency Management and Evacuation Plan in accordance with the NSW Rural Fire Service document 'A Guide to Developing a Bushfire Emergency Management and Evacuation Plan'. iii. The required bushfire protection measures must be implemented prior to occupation, where applicable, and maintained for the life of the development. iv. 9.9 The operation and day-to-day management of the development must at all times be undertaken in accordance with the approved Plan of Management for the site, being 'The Glen for Men Operational Plan', Revision C, prepared by Paul Hartley and dated 17 October 2025." (New condition 6.23, emergency planning and implementation) Operations must follow The Glen for Men Operational Plan, Revision C. Amendments to that Plan concerning client or occupant numbers, operating hours, staffing, activities, or the nature or intensity of the approved use require Council's prior written approval. "iii. The required bushfire protection measures must be implemented prior to occupation, where applicable, and maintained for the life of the development. iv. 9.9 The operation and day-to-day management of the development must at all times be undertaken in accordance with the approved Plan of Management for the site, being 'The Glen for Men Operational Plan', Revision C, prepared by Paul Hartley and dated 17 October 2025. v. The Plan of Management must not be amended in relation to client or occupant numbers, hours of operation, staffing arrangements, activities undertaken on the site, or the nature or intensity of the approved use without the prior written approval of Central Coast Council Local Planning Panel Minutes 19 November 2026 Page 5 Council." (New condition 9.9, Plan of Management) Before the relevant Construction Certificate is issued, fire-safety details for buildings being repurposed must be submitted to the Principal Certifier. Necessary fire-safety upgrades must be incorporated into the certificate documentation and completed as part of the building works. "Otherwise, a copy of an amended Plan of Management shall be provided to Council and the Local Area Command of NSW Police. b. Amended Conditions i. That condition 2.15 is amended to now sit as condition 2.14 and is to read as follows: Prior to the issue of the relevant Construction Certificate, submit details to the Principal Certifier demonstrating that the existing buildings subject to repurposing achieve an adequate level of fire safety in accordance with a fire safety report prepared by a suitably qualified person. ▪ The fire safety report must identify the measures necessary to satisfy the relevant performance requirements of the National Construction Code, Building Code of Australia, as applicable, to: ▪ Protect persons using the building and facilitate their safe egress from the building in the event of fire; and ▪ Restrict the spread of fire from the building to other buildings nearby. ▪ All fire safety upgrade works identified as necessary by the fire safety report and the approved Building Code of Australia Assessment Report must be incorporated into the relevant Construction Certificate documentation and completed as part of the building works." (Amended condition 2.14) SOURCES https://docspublished.com.au/centralcoastcouncil/document/578f2f8d-b5ba-4119-bd01-0acf642603e3 https://minutesradar.com/news/central-coast-infocouncil-local-planning-panel-thursday-19-november-2026-19-nov-2026-12-00-pm-minutes-tuggerah-s-glen-rehabilitation-centre-b1a22d4175/ Prepared from public council minutes using automated drafting and checks. No meeting attendance or interviews are implied. Check the original record and seek comment before republishing claims or analysis. Illustrations are generic, not depictions of actual projects.